Graphic Version | Home | Sitemap | Contact us | A-Z of Services | | | Change Contrast
Home | Sitemap | Contact us
 


You are here:- Environment and planning > Planning  > Planning policy > Local Development Framework > Annual Monitoring Report > Adequate housing > Development characteristics

Section Topics:-

Contact

Mail :
Local Development Framework
Dept. of Development
Plymouth City Council
Plymouth PL1 2AA
Phone :
01752 304822
Email :
ldf@plymouth.gov.uk
Image of a person holding a graph

Development Characteristics

We aim to ensure that a mixture of different types and sizes of homes are developed to meet the needs of the city.

Green Traffic Light Indicating Progress Is On Track Local Output Indicator

Ensuring the provision of an appropriate mix of type, size and tenure of housing.

This target is improving.

PDF icon Summary of dwelling completions 2010 to 2011 chart and data table [20KB]

Of the dwellings completed in the past year:

PDF icon Percentage of new build completions chart and data table [60KB]

In the years up to 2009, redevelopment was taking place in the waterfront regeneration areas and was characterised by a high number of new flats, up to 83 per cent of all new homes. This produced an average development density for the city of 131 dwellings per hectare.

The type of dwellings completed in 2010 to 2011 show a more balanced mix as a result of the progress of a number of large redevelopment sites - at Southway, and other less densely developed sites. These are characterised by a higher proportion of semi-detached and terraced houses. In 2010 to 2011 the average development density for the city was 56 dwellings per hectare (dph), similar to that of the previous year.

PDF icon Density of new dwellings 2001 to 2011 chart and data table [40KB]

In 2010 to 2011, 96 per cent of new housing has been at density levels above 30 dwellings per hectare and 75 per cent has been above 50 dwellings per hectare.

This page of the annual monitoring report was last updated December 2011.