Contact

Mail :
Plymouth Transport and Highways
Plymouth City Council
Plymouth PL1 2AA
Phone :
01752 668000 (24 hrs)
Email :
plymouth.watchman@amey.co.uk

Links

Phase 2 road humps/tables

Road humps/tables at Caprera Terrace and the Station Access Road are part of the Phase 2 improvements. Formal consultation on the proposal to install road humps was carried out from 24 November 2011 to 16 December 2011. This included advertising the proposed road humps in the local press, notices placed at the site, letters sent to residents adjacent the station and the businesses within the station area, local bus and taxi operators, the station's operators First Great Western, Network Rail and the emergency services.

The statutory deposit documents, Phase 2 scheme plan and the proposed scheme letter can be viewed below.

The issues raised through the consultation and our recommendations were reported to the Cabinet Member for Transport on 19 January 2012 through the delegated decision process. Read the Plymouth Railway Station Phase 2 - North Road East Road Humps Consultation delegated decision report.